For civil, structural, drainage and transport consultancies in the UK
Your drawings and reports, checked against each other before you issue them.
IssueCheck reads the drawings, reports and registers in a submission and lists anything that disagrees between them, with page references.
Had an email from us? Just reply to it.
Documents
- Drainage Strategy
- Flood Risk Assessment
- Transport Statement
- Drawing register
- C-101 External levels, P2
- C-110 Drainage layout, P5
- C-130 Long sections, P3
- C-140 Manhole schedule, P3
- C-201 Drainage details, P3
- and 5 more
Findings 5
Each one is for your engineer to confirm
- 1Discharge rate stated two waysDrainage Strategy p.9 · C-201 rev P3
- 2Floor level stated two waysFRA p.12 · C-101 rev P2
- 3Cited revision isn’t in the setDrainage Strategy p.6 · C-140
- 4Register and title block disagreeDrawing register · C-110
- 5Trip total doesn’t match its tableTransport Statement p.18
1 · Discharge rate stated two ways
Drainage Strategy · p.9
Discharge from the site will be limited to 4.2 l/s.
Drawing C-201 rev P3 · flow control note
Flow control FC1 limits discharge to 3.8 l/s.
Which one is right is for your engineer to decide.
It reads the PDFs you issue together:
- Drawings
- Drawing registers
- Flood risk assessments
- Drainage strategies
- Transport statements
- Calculations
How a check works
-
You upload
The PDFs you’re about to issue.
Drawings, reports, calculations and the drawing register, as they’ll go out.
-
IssueCheck reads
Every page of every document.
It compares the figures, drawing numbers and revisions that appear in more than one place.
-
You get back
A list of every disagreement.
Each one names both documents and pages, for your engineer to confirm before the package goes out.
What it checks
- One figure stated two ways
- The FRA gives a finished floor level of 24.60 m AOD on p.12; drawing C-101 rev P2 shows 24.45 m AOD.
- The drawing register against the title blocks
- The register lists C-110 at rev P4; its title block says P5.
- A title block against its own revision table
- C-130’s title block says rev P3; its revision table stops at P2.
- Cited revisions that don’t exist
- The drainage strategy cites C-140 rev P4 on p.6; the latest in the set is P3.
- Totals that don’t add up
- The transport statement gives 412 two-way trips on p.18; the rows of its Table 5.2 add up to 486.
What it doesn’t do
No design checking
It won’t tell you whether a pipe is big enough or a beam strong enough.
No code compliance
It doesn’t check anything against the Eurocodes, DMRB or local standards.
An engineer still signs off
Each finding is a pointer for your engineer to confirm, and some will turn out to be fine.
Pilot it on your next submission
Book a demo and we’ll walk you through a check. If it’s useful, we’ll run IssueCheck on your next submission before it goes out.
Or write to hello@issuecheck.co.uk
Questions
What do I upload?
The PDFs you’re about to issue together: the drawings, the reports with their calculations, and the drawing register.
What comes back?
A list of every disagreement IssueCheck finds between the documents. Each one names both documents and the pages involved, like the example at the top of this page.
Anything else? Write to hello@issuecheck.co.uk.